3 Startup Hard
<kuid:86661:9991013>
| Map: | SS Hull Oakes Mill Inglenook |
| Author: | slugsmasher |
| Kind: | profile |
| Build: | 3.2 (TS2010 ) |
| Size: | 100.79KB |
| Uploaded: | 2026-09-02 |
| Downloads: |
1
-
+
|
3 Startup Hard
Welcome to Slugsmashers Hull Oakes Mill Inglenook Hard Difficulty Session.
Well the new guy at Corvallis yard gooned up the consist and ran out of time. Handing the train to you, you now have a slight mess to work out. You have the usual task to drop off empties and pick up loads, however you also have the caboose in the wrong position and an extra flat car. Leave the empty bulkhead flatcars on Track A and leave the empty hoppers on Track C. You need to place the caboose at the end of the train once finished switching. The flat car can stay next to the engine and take it back to Corvallis once finished.
When all the loaded cars are in the train, you may switch the derail to the main and head to Corvallis.
Session should take about 40 minutes.
The switch marked DERAIL is the designated yard limit, you may not cross this switch until the job is completed.
Recommend saving progress periodically just in case you derail or something.
Good Luck - Slugsmasher
www.steammachine.com/slugsmasher
- 3 Startup Hard
- config.txt 3.37KB
- profile.dat 34.49KB
- profile.lyr 25 bytes
- profile.obs 36 bytes
- profile.trk 68 bytes
- ssho4_tn_256.jpg 105.53KB
User photos
No one has uploaded a photo of this object yet.

Comments:
Sign in to post a comment