DSEPR02 Pilbara Iron Demonstration Session
<kuid:582486:104423>
| Map: | DSEPR02 Pilbara Iron v2 |
| Author: | anathoth71 |
| Kind: | profile |
| Build: | 4.5 |
| Size: | 1.74MB |
| Uploaded: | 2025-10-16 |
| Downloads: |
1
-
+
|
DSEPR02 Pilbara Iron Demonstration Session
This session is intended to be started for the purpose of observing most of the common train movements that are required to operate DSEPR02 Pilbara Iron. You don't need to do much except observe what the AI drivers will hopefully do.
You do have one optional task however. A few minutes after the session starts, an AI ore train from Paraburdoo will stop at the point where it's pusher locos need to be removed. The driver called Demo pusher cutoff will use the Notify command after it arrives to alert you. Don't forget to enable the message overlay after the session starts to see driver messages. You will have 10 minutes to remove the two pusher locos before it resumes it's journey to Rosella where it will park. Appoint the spare driver to the pushers and dispatch him to navigate to the trackmark BANKSIA~siding down to clear the mainline. Then ensure the ore train departs and continues toward ROSELLA. Failing to do this task won't ruin the session, so don't worry if you miss it.
AI Train generation is disabled for this session.
- DSEPR02 Pilbara Iron Demonstration Session
User photos
No one has uploaded a photo of this object yet.

Comments:
Sign in to post a comment