Celilo_Draw_Bridge_1
Details

Celilo_Draw_Bridge_1

<kuid2:210518:10644:1>

Author: bendorsey
Kind: mocrossing
Build: 2.9 (TS2009)
Size: 1.29MB
Uploaded: 2026-02-02
Downloads:
1
-
0
+

Celilo_Draw_Bridge_1

This is a specialized version of the Celilo Draw Bridge which can be used to re-create
the actual span. The real bridge includes part of a wye on deck plate girders off the end farthest from the
lift span. You must add them and a switch in surveyor. I would suggest one of Maddy25's deck plate girder spines.
I can make a switch in Gmax but it will not switch in Trainz. The bridge is normally open and closes at the
approach of a train in 20 seconds.

Author: Benjamin R. Dorsey

    Celilo_Draw_Bridge_1
  • black.bmp 3.05KB
  • black.texture.txt 28 bytes
  • celilo draw bridge 1.jpg 12.40KB
  • concrete5.jpg 54.85KB
  • concrete5.texture.txt 32 bytes
  • concrete6.jpg 22.54KB
  • concrete6.texture.txt 32 bytes
  • config.txt 2.86KB
  • ll metal.jpg 1.11KB
  • ll metal.texture.txt 31 bytes
  • metal5.jpg 18.84KB
  • metal5.texture.txt 29 bytes
  • part_1.im 718.11KB
  • part_1.kin 58.77KB
  • part_2.im 1.31MB
  • part_3.im 1,011.86KB
  • part_4.im 1,011.86KB
  • part_5.im 907.45KB
  • wood2.jpg 23.21KB
  • wood2.texture.txt 28 bytes

User photos

No one has uploaded a photo of this object yet.