EP Switch 01

EP Switch 01

<kuid:210096:28056>

Author: HSSRAIL
Kind: mojunction
Build: 2.7
Size: 490.70KB
Uploaded: 2026-01-03
Downloads:
0
-
0
+

EP Switch 01

EP stands for Electro-Pneumatic.
EP Interlockings began to become widespread towards the close of the 19th Century.
They were used at most major railroad terminals in the United States a few of them
are still in service today. The Placement of the control valve which is off to the side
of the switch machine itself varies considerably. EP switches throw very quickly
there biggest problem is that they are not dual control switches. That is if the machine
fails to indicate a switch position a train crew on the ground can not hand operate them
only a signal maintainer can. By the standards of the day they were very reliable.
If they do fail they can cause catastorphic consequences to train operations as these
machines were deployed at major rail terminals like Penn Station, Los Angelos Union
Passenger Terminal, Grand Central, etc. The trend is towards rapid retirement of this
technology.

    EP Switch 01
  • config.txt 2.23KB
  • lever1
  • concrete.texture.txt 31 bytes
  • concrete.tga 192.04KB
  • ep_switch.im 45.82KB
  • metal.texture.txt 28 bytes
  • metal.tga 192.04KB
  • misc.texture.txt 27 bytes
  • misc.tga 192.04KB
  • lever2
  • concrete.texture.txt 31 bytes
  • concrete.tga 192.04KB
  • ep_switch_reverse.im 45.86KB
  • metal.texture.txt 28 bytes
  • metal.tga 192.04KB
  • misc.texture.txt 27 bytes
  • misc.tga 192.04KB
  • machine.jpg 27.70KB
  • machine.wav 75.09KB

VE48: This asset uses an obsolete trainz-build number. Trainz-build numbers below 3.5 are no longer supported.
VE109: The low-detail meshes total more than 500 polygons. This may have a negative impact on performance: 0: 585

User photos

No one has uploaded a photo of this object yet.