Stocks and tanks revised
Details

Stocks and tanks revised

<kuid2:101340:100221:1>

Map: Northern Pacific Billings and Laurel yards 1960 revised
Author: gary_evans
Kind: profile
Build: 4.3 (Trainz A New Era SP1)
Size: 68.23KB
Uploaded: 2025-12-30
Downloads:
0
-
0
+

Stocks and tanks revised

While the switch engine waited on the track outside the yard office, our foreman obtained his switching orders for the beginning of the shift. The switch list read as follows:
Pick up the 3 loaded stock cars at Union Stockyard
Spot the 3 stock cars on the stock siding
Back to stock yard 2 Spot the 3 empties on stock 1 No need to uncouple
Drive to refinery and pick up GATX tanks on refinery 2
Pull the tanks back Leave them on the siding
Pick up the 3 stocks Couple to the tanks and pull the string back to end of siding
Couple to the hoppers on the power siding

We pick up the switch engine on its way to the stock siding and follow it until NP train #604 picks up the stock and tanks.

    Stocks and tanks revised
  • config.txt 44.69KB
  • profile.dat 146.50KB
  • profile.lyr 28 bytes
  • profile.obs 3.24KB
  • profile.rlr 36 bytes
  • profile.trk 629 bytes
  • thumbnail.jpg 40.79KB

User photos

No one has uploaded a photo of this object yet.